Commercial halls Niederkassel Rheidt
In Litauer Street, just a few minutes away from the city center, there were three modern industrial halls constructed with 18 rental units in total. The construction work included the excavation to implement a blinding layer for the foundations, followed by the delivery and alignment of the prefabricated columns. The halls A, B and C were completed end of 2021, so that beginning of 2022 the extension works could be started.
The construction company is using high-quality prefabricated components, including columns and trusses, and is producing tension beams from cast-in-place concrete. Other prefabricated components, such as the interior and exterior walls, are also being installed. Completion of Halls A, B, and C is scheduled for the end of 2021, allowing electrical work to begin in early 2022.
The halls offer a flexible use and are ideal for different trades. The building A covers a floor area of 99,90m x 31,20m and consists of six single halls which can be divided by optional partitions. Building B with a floor area of 39,40m x 30,30m was constructed at the southern property boundary, whereas building C has a floor area of 55,90m x 31,20m. These new buildings are made to meet the requirements of the companies in the region and offer modern standards for an efficient use.
We are pleased to help you with further information.
Data & Facts
- Completion: Spring 2022
- Performance Period: September 2021
- Bauherr: Josef Klein GmbH & Co. KG
- Construction Performance: Turnkey with planning phase 1-8 / General Contractor
- Building Floor Area: 6.090 m²
- Planning Area:
- Construction Volume: 6.500.000,00 €